Design, project management, cost control and supervision for works associated the provision of replacement of 2 No. 250,000 Litre 6.0 m High x
7.5 m Diam. tanks with 4 No. 200,000 Litre 16.0 m High x 4.0 m Diam. Tanks. Works include phased modifications to existing pipework arrangements to ensure services are always available to a live food processing facility with a demanding process schedule.